City systems
Government operations
The work behind the work — crews, work orders, inspections, code cases, meters, fleet and GPS, assets and capital projects.
Modules in this family
- Fleet managementDemonstration
Every unit the city owns, what it costs to run, when it is due, and who had it.
Open the screen - GPS & vehicle trackingDemonstration
Where the crews are, so dispatch stops guessing and a resident gets a real arrival window.
Open the screen - Fuel, maintenance & mileage logsDemonstration
Fuel draws matched to the unit and the odometer, so the fuel card reconciles itself.
Open the screen - Preventive maintenanceDemonstration
Oil, brakes, tyres, the annual state inspection, the fire pump test and the backhoe's hydraulics — scheduled on whichever of miles, engine hours or the calendar comes first.
Open the screen - Work orders & crew dispatchDemonstration
A request becomes a work order becomes a closed job with a date, materials and the crew that did it.
Open the screen - Inspections on a phone — works offlineDemonstration
Out at a site with no bars, the inspection still saves, and syncs when the truck gets back in range.
Open the screen - Code enforcement case filesDemonstration
Photographs, notices, deadlines and the court packet, in one case file that survives a change of staff.
Open the screen - Asset & equipment inventoryDemonstration
What the city owns, what it is worth, where it is, and who signed for it.
Open the screen - Utility service orders & meter routesDemonstration
Turn-ons, turn-offs, re-reads and leak checks as a route a crew can work down in order.
Open the screen - Street, sign & drainage inventoryDemonstration
Every sign, every inlet, every block of pavement with a condition rating — which is what a paving grant application asks for.
Open the screen - Animal controlDemonstration
Intake, bite reports, quarantine, adoption and the public list of found pets, from one record.
Open the screen - Project & capital-improvement trackingDemonstration
The wastewater plant expansion, the water loop, the downtown rehabilitation — budget, draw-downs and the grant each one answers to.
Open the screen - Costed, not built
HR, onboarding & time
Applications, onboarding paperwork, required training and time and attendance for a workforce that mostly does not sit at a desk.